MEG Documents
Proposal and related
Major preprints
-
Preprint on the analysis of 2021–2022 MEG II data (Apr 2025)
-
Preprint on search for X17 particle (Nov 2024)
-
Preprint on the analysis of the first MEG II data (Oct 2023)
-
Preprint on the MEG II detector (Oct 2023)
-
Preprint on search for μ → eX, X → γγ with the MEG data (May 2020)
-
Preprint on the design of the MEG II experiment (Jan 2018)
-
Preprint on the final results of the MEG experiment (May 2016)
-
Preprint on the measurement of the μ → eννγ branching ratio (Dec 2013)
-
Preprint on the MEG detector (Mar 2013)
-
Preprint on the analysis of 2009–2011 data (Mar 2013)
-
Preprint on the analysis of 2009 & 2010 data (Jul 2011)
-
Preprint on the analysis of the first MEG data (Aug 2009)
Major articles
The full list of publications is available at
ELOG/Publication List.
Theses
Reports
Talks from
- Conferences
- Seminars
- JPS meetings (in Japanese)
- Workshops in Japan (in Japanese)
- Review meetings
- 15-16th July 2002
- T. Mori, "Goals of the experiment"
[PDF]
- A. Baldini, "Status in Italy"
[PowerPoint, PDF]
- P.-R. Kettle, "Beam line"
[PowerPoint, PDF]
- W. Ootani, "COBRA magnet"
[PowerPoint, PDF]
- J. Egger, "Drift chambers"
[PowerPoint, PDF]
- A. Baldini, "Timing counters"
[PowerPoint, PDF]
- S. Mihara, "Photon detector"
[PowerPoint, PDF]
- T. Haruyama, "Photon detector cryogenics"
[PowerPoint, PDF]
- G. Signorelli, "Simulation of the final photon detector"
[PowerPoint, PDF]
- M. Grassi, "Trigger"
[PowerPoint, PDF]
- S. Ritt, "Slow control and DAQ"
[PowerPoint, PDF]
- T. Mori, "Summary talk"
[PDF]
- 3rd February 2003
- P.-R. Kettle, "Beam tests"
[PowerPoint, PDF]
- S. Mihara, "LXe part A"
[PowerPoint, PDF]
- G. Signorelli, "LXe part B"
[PowerPoint, PDF]
- W. Ootani, "COBRA magnet"
[PowerPoint, PDF]
- M. Hildebrandt, "Drift chamber"
[PowerPoint, PDF]
- G. Cecchet, "Timing counter"
[PowerPoint, PDF]
- M. Grassi, "Trigger"
[PowerPoint, PDF]
- S. Ritt, "Computing"
[PowerPoint, PDF]
- S. Ritt, "Schedule"
[PowerPoint, PDF]
- S. Mihara, "Report on the Progress for μ → eγ Experiment"
[Powerpoint]
- 11th July 2003
- 11th February 2004
- 1st July 2004
- A. Baldini, Introduction
- F. Cei, Neutron Background Measurements
- S. Mihara, Xenon Detector Status
- J. Egger, Drift Chamber
- F. Gatti, Timing Counter Status
- P.-R. Kettle, Beam Line Status
- W. Ootani, COBRA Magnet Status
- S. Ritt, Status of the electronics systems
- S. Yamada, Software Status
- C. Gatoo, Offline Software
- S. Ritt, Schedules
- 9th February 2005
- T. Mori, Introduction
- A. Baldini, LXe Calibration, PMT Tests, Cryostat Construction
- S. Mihara, LXe beam Test Results
- P.-R. Kettle, Beam Line Status
- W. Ootani, COBRA Magnet Status
- J. Egger, Drift Chamber
- F. Gatti, Timing Counter Status
- S. Ritt, Status of the Electronics Systems
- C. Gatto, Software Status
- S. Ritt, Schedules
- 19th July 2005
- A. Baldini, Introduction
- P.-R. Kettle, Beam Line Status
- W. Ootani, COBRA Magnet Status
- S. Mihara, LXe detector status report
- C. Bemporad, LXe calorimeter calibration
- J. Egger, Drift Chamber
- F. Gatti, Timing Counter Status
- M. Grassi, Status of the Electronics Systems
- F. Cei, Software Status
- S. Ritt, Schedules
- A. Baldini et al., Technical Note #27
- 15th February 2006
- 27th June 2006
- 14th February 2007
- T. Mori, Short Summary
- M. Hildebrandt, Run2006 summary
- P.-R. Kettle, Beamline Status
- P.-R. Kettle, Cockcroft-Walton Status
- W. Ootani, COBRA Magnet Status
- S. Mihara, LXe detector status report
- J. Egger, Drift Chamber
- M. Schneebeli, Drift Chamber Analysis
- P. Cattaneo, Timing Counter Status
- P. Cattaneo, TC Results from Frascati beam time
- P. Cattaneo, TC Results from PSI beam time
- S. Ritt, Status of the Electronics Systems
- F. Cei, Software Status
- A. Baldini, Summary talk
- 18th July 2007
- 20th February 2008
- 18th February 2009
- 17th February 2010
- A. Baldini, Summary Talk
- P.-R. Kettle, Run Summary 2009
- D. Nicolo, Trigger Status
- S. Ritt, Data Acquisition Status
- A. Papa, Detector Calibrations
- M. Hildebrandt, Drift Chamber Hardware Status
- W. Molzon, DC Analysis Status
- S. Mihara, Liquid Xenon Calorimeter Status
- R. Sawada, Liquid Xenon Calorimeter Analysis
- F. Gatti, Timing Counter Status
- C. Voena, Timing Counter Analysis
- F. Cei, MEG Physics Analysis Status
- Starting from 2011, the review talks are available from the Indico site. Public review meeting minutes are listed below: